Activities carried out:
– Stability (Stockholm Agreement) (Hs=2,5 – 3.1 m) SOLAS 90 (F=1)&(F=0,5)
– Inclining Test
-Ballast water management Plan (according to BWM code)
– Structural fire protection according to MSC 24(60)
– Refitting of accommodation area
– Live saving plan
– Evacuation Plan
– Ventilation plan
– Fire Plan
– Sprinkler Plan
– Drencher Plan
– Equipment Number
– Shipyard supervisor during refitting works in Tuzla (Turkey)